Torrens Island B (TORRB1)

Gas Baseload · AGL SA Generation Pty Limited · Turbine - Steam Sub Critical

Closed AEMO: In Service - Announced Withdrawal (Permanent) SA1 Fossil - Natural Gas Pipeline NEM data · 24 hours
200 MW
Registered nameplate capacity
Est. SRMC
$2.00/MWh
Key information
Capacity
200 MW

AEMO status In Service - Announced Withdrawal (Permanent)
Project status Closed (AI)

AEMO registration status indicates In Service - Announced Withdrawal (Permanent); asset is identified as permanently withdrawn/retiring.

Region SA1
Coordinates -34.80900, 138.47800 (AI)

Approximate Torrens Island industrial site location (Adelaide, South Australia); precise unit-level coordinates not found.

DUID TORRB1
Owner AGL SA Generation Pty Limited
Commissioned
Expected closure 2026
Closure date 30 Jun 2026
Technology Turbine - Steam Sub Critical
Fuel Fossil - Natural Gas Pipeline
Equipment OEM Siemens
Equipment type / model steam turbine generator (subcritical)
Equipment confidence low
Stats window
01 Aug 2026 23:15 → 02 Aug 2026 23:15 AEST

Dispatch & revenue

01 Aug 2026 23:15 → 02 Aug 2026 23:15 AEST

No dispatch data for DUID TORRB1 in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Other
Capacity
200 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$2.00/MWh
Capex total (greenfield) default
$400.00M

Shown in table
$400.00M (2026 real AUD)

Capex refurbishment
Capex / MW default
$2,000,000

Shown in table
$2.00M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh default
$2.00

Shown in table
$2.00 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown