BESS · Vena Energy · Storage - Battery
12 Jun 2026 14:05 → 13 Jun 2026 14:05 AEST
| Capex total (greenfield) |
$31.01M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$236.4k
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$5,696
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No plant-specific greenfield capex figure was found for the 41.5 MW Tailem Bend 2 battery. Vena Energy project pages confirm the 41.5 MW BESS and 2024 COD, but do not disclose a standalone construction cost. Fallback operating assumptions use AEMO/Aurecon 2024 BESS parameters for a 1-hour lithium-ion BESS: 84% round-trip efficiency, 20-year life, and $5,400/MW-year fixed O&M. Variable O&M is treated as nil in the source table for BESS.