BESS · Supernode Operations Pty Ltd as the trustee for Supernode BESS 1 Project Trust · Storage - Battery
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
22 Jul 2026 00:00 → 22 Jul 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
Stored energy at the start of each 5‑minute interval (AEMO INITIAL_ENERGY_STORAGE).
Available up to the latest next‑day dispatch file.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.| Effective from | MLF |
|---|---|
| 2026-02-17 | 1.0000 |
| Capex total (greenfield) default |
$434.00M
Shown in table |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage default |
$350,000
Shown in table |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: unknown · Status: needs review · Capex basis: unknown