Summerfield BESS (SMFBESS1)

BESS · CI Summerfield BESS Pty Ltd (ACN 656 223 773) as trustee for the CI Summerfield BESS Trust · Storage - Battery

Construction AEMO: Publicly Announced SA1 Other - Other NEM data · 30 days
240/960 MW
Researched capacity / storage
30 days revenue
$-143
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$1.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity (AI)
240 MW / 960 MWh

Construction Front 2025; Summerfield BESS described as a 240 MW / 960 MWh four-hour battery storage project.

AEMO status Publicly Announced
Project status Construction (AI)

Construction Front 2025; CIP began construction on the 240 MW / 960 MWh Summerfield BESS in Australia after FID in Sep 2024.

Region SA1
Coordinates -35.07300, 139.11400 (AI)

ESCOSA 2026; battery energy storage system plants located at 120 Hoff Road, Tepko, South Australia.

DUID SMFBESS1
Owner CI Summerfield BESS Pty Ltd (ACN 656 223 773) as trustee for the CI Summerfield BESS Trust
Commissioned Dec 2025
Expected closure 2046
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Equipment confidence low
Stats window
23 Jun 2026 06:05 → 23 Jul 2026 06:05 AEST

Dispatch & revenue

23 Jun 2026 06:05 → 23 Jul 2026 06:05 AEST

Energy revenue (× MLF)
$-143
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
-2.0 MWh
Available
MWh
Curtailed
2.0 MWh
Curtailment
of available
MLF used
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of chargeINITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2026-06-30 0.9998
2026-07-01 1.0008

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
240 MW / 960 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield) default
$336.00M

Shown in table
$336.00M (2026 real AUD)

Capex refurbishment
Capex / MWh storage default
$350,000

Shown in table
$350.0k (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown