Riverina Energy Storage System 2 (RIVNB2)

BESS · RESS 2 Pty Ltd · Storage - Battery

Operational AEMO: In Service NSW1 Other - Other NEM data · 2h
65/130 MW
Registered nameplate capacity / storage
2h revenue
$-4
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$1.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
65 MW / 130 MWh

AEMO status In Service
Project status Operational (AI)

Edify Energy project page and EnergyAustralia media release (2023) describe the Riverina/Darlington Point battery as commissioned / in commercial operation.

Region NSW1
Coordinates -34.64700, 146.03400 (AI)

NSW Planning Portal PDF for Riverina BESS Stage (2022) gives site coordinates near 34°38'49.3"S 146°02'02.9"E.

MLF 0.9443
DUID RIVNB2
Owner RESS 2 Pty Ltd
Commissioned Aug 2023
Expected closure 2051
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM Tesla
Battery platform / chemistry Megapack
Inverter OEM Tesla
Inverter / PCS model Megapack PCS / inverter
Equipment confidence high
Stats window
14 Jun 2026 00:00 → 14 Jun 2026 02:20 AEST

Dispatch & revenue

14 Jun 2026 00:00 → 14 Jun 2026 02:20 AEST

Energy revenue (× MLF)
$-4
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
0.0 MWh
Available
MWh
Curtailed
0.1 MWh
Curtailment
of available
MLF used
0.9443
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-18 0.8774
2025-07-01 0.9443

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
65 MW / 130 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield) default
$45.50M

Shown in table
$45.50M (2026 real AUD)

Capex refurbishment
Capex / MWh storage default
$350,000

Shown in table
$350.0k (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown