Riverina Energy Storage System 1 (RESS1G)

BESS · Shell New Energies Australia Pty Ltd · Storage - Battery

Operational AEMO: In Service NSW1 Other - Other NEM data · 24 hours
60/120 MW
Registered nameplate capacity / storage
Est. SRMC
$0.00/MWh
Key information
Capacity
60 MW / 120 MWh

AEMO status In Service
Project status Operational (AI)

Region NSW1
Coordinates —

DUID RESS1G
Owner Shell New Energies Australia Pty Ltd
Commissioned Feb 2023
Expected closure 2051
Closure date —
Technology Storage - Battery
Fuel Other - Other
Battery OEM —
Battery platform / chemistry —
Inverter OEM —
Inverter / PCS model —
Stats window
25 Sep 2026 07:00 → 26 Sep 2026 07:00 AEST

Dispatch & revenue

25 Sep 2026 07:00 → 26 Sep 2026 07:00 AEST

No dispatch data for DUID RESS1G in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
60 MW / 120 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$44.30M

Shown in table
$44.30M (2026 real AUD)

Reported / source value
$42.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
—
Capex / MWh storage derived
$369,198

Shown in table
$369.2k (2026 real AUD)

Reported / source value
$350.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$1.37M

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$22,785

Shown in table
$22.8k (2026 real AUD)

Reported / source value
$21.6k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
Riverina Energy Storage System 1 is a 60MW/120MWh battery partition within the broader Riverina project. Public sources identified the asset and its operation, but I did not find a project-specific total construction/investment cost for this 60MW tranche. As a fallback, battery O&M values were derived from AEMO's 2024 Energy Technology Cost and Technical Parameter Review; capex was left blank because no reliable plant-specific or benchmark figure was requested to be substituted without explicit need.