Murray 1 (MURRAY)

Hydro · Snowy Hydro Ltd · Hydro - Dam

Operational AEMO: In Service VIC1 Hydro - Water NEM data · 30 days
950 MW
Registered nameplate capacity
30 days revenue
$23.34M
Capacity factor
31.3%
Revenue / MWh
$108.91
Est. SRMC
$1.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
950 MW

AEMO status In Service
Project status Operational (AI)

Power Technology profile (commissioned 1966) and Snowy Hydro site indicate Murray 1 is in service / operating.

Region VIC1
Coordinates -36.24680, 148.19020 (AI)

GEO Global Energy Observatory lists Murray-1 at Khancoban, NSW with coordinates -36.2468, 148.1902.

MLF 0.9819
DUID MURRAY
Owner Snowy Hydro Ltd
Commissioned
Expected closure 2070
Closure date
Technology Hydro - Dam
Fuel Hydro - Water
Turbine OEM Boving Engineering
Turbine type / model Francis turbine
Equipment confidence medium
Stats window
14 May 2026 23:05 → 13 Jun 2026 23:05 AEST

Dispatch & revenue

14 May 2026 23:05 → 13 Jun 2026 23:05 AEST

Energy revenue (× MLF)
$23.34M
FCAS revenue (× MLF)
$1.3k
FCAS volume
7,636.4 MWh
Dispatched
214,314.7 MWh
Available
899,192.6 MWh
Curtailed
686,511.2 MWh
Curtailment
76.3%
of available
MLF used
0.9819
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9947
2025-07-01 0.9819

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Hydro
Capacity
950 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.00/MWh
Capex total (greenfield) default
$3,800.00M

Shown in table
$3,800.00M (2026 real AUD)

Capex refurbishment
Capex / MW default
$4,000,000

Shown in table
$4.00M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh default
$1.00

Shown in table
$1.00 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown