Hydro · Mount Rawdon Pty Ltd · Storage - Pumped hydro
13 Jun 2026 08:40 → 14 Jun 2026 08:40 AEST
| Capex total (greenfield) |
$6,140.00M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
How this was derived |
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$216,068
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$13.86
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Project-specific capital cost was found from Queensland Government project information: $6.14 billion investment for a pumped hydro energy storage facility with up to 20,000 MWh storage capacity. A separate earlier project statement cited estimated capital costs of A$1.2–A$1.4 billion, but that appears to be an older estimate and was not used for the reported capex total. No reliable public source for registered MW capacity was found in the retrieved results, so capex_per_mw_aud was not calculated. O&M and technical parameters were not found specifically for this project, so AEMO/Aurecon pumped hydro benchmark parameters were used as fallback for O&M only.