MacIntyre Wind Farm (MCINTYR1)

Wind · Macintyre Windfarm Pty Ltd and Arc Energy Macintyre Pty Ltd · Wind Turbine - Onshore

Commissioning AEMO: Committed* QLD1 Wind - Wind NEM data · 6h
923 MW
Registered nameplate capacity
6h revenue
$46.0k
Capacity factor
12.3%
Revenue / MWh
$67.45
Est. SRMC
$0.58/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
923 MW

AEMO status Committed*
Project status Commissioning (AI)

ACCIONA Energía community page says construction complete in 2026 and operations due from 2026; Renewables Now reported first power export in Oct 2024.

Region QLD1
Coordinates

MLF 0.9723
DUID MCINTYR1
Owner Macintyre Windfarm Pty Ltd and Arc Energy Macintyre Pty Ltd
Commissioned Nov 2025
Expected closure 2054
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Nordex
Turbine model N163/5.X
Equipment confidence high
Stats window
14 Jun 2026 00:00 → 14 Jun 2026 05:55 AEST

Dispatch & revenue

14 Jun 2026 00:00 → 14 Jun 2026 05:55 AEST

Energy revenue (× MLF)
$46.0k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
681.3 MWh
Available
618.1 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9723
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-08-13 0.9734
2025-07-01 0.9723

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
923 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.58/MWh
Capex total (greenfield)
$2,082.51M

Shown in table
$2,082.51M (2026 real AUD)

Reported / source value
$2,000.00M (2022 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

How this was derived
Official ACCIONA announcement of total construction investment for the MacIntyre Wind Precinct.

Reference
Golden age for renewable energy dawns as construction starts on Australia’s largest wind farm (high confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MW derived
$2,255,259

Shown in table
$2.26M (2026 real AUD)

Reported / source value
$1.93M (2022 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived per-MW capex using the official precinct investment and precinct capacity.

Reference
Golden age for renewable energy dawns as construction starts on Australia’s largest wind farm (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX (annual)
$59.33M

Shown in table
$59.33M (2026 real AUD)

Reported / source value
$50.79M (2022 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$64,252

Shown in table
$64.3k (2026 real AUD)

Reported / source value
$55.0k (2022 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Fallback default supplied by user instructions; no plant-specific official O&M figure found in the searched sources.

Variable OPEX / MWh
$0.58

Shown in table
$0.58 (2026 real AUD)

Reported / source value
$0.50 (2022 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Fallback default supplied by user instructions; no plant-specific official variable O&M figure found in the searched sources.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026

Notes
Wind asset—fuel use/heat rate not applicable. CAPEX and O&M populated from AEMO/CSIRO ETC review where available; no brownfield/turbine replacement refurbishment identified in searched sources for this DUID as of 2026-06-04.

Latest AI note (4 Jun 2026)

Used project-specific reported construction investment of about AUD 2.0 billion for the 1,026 MW MacIntyre Wind Precinct, which includes the 923.4 MW MacIntyre Wind Farm. No separate plant-only capex for the 923.4 MW asset was found in official sources, so the precinct-level figure was allocated across the MacIntyre wind farm capacity for normalization. CleanCo/ACCIONA sources confirm the 923 MW asset is part of the 1,026 MW precinct and that the precinct’s total investment is about AUD 2 billion.

Sources