BESS · Lake Bonney BESS Pty Limited · Storage - Battery
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 19:05 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-09-26 | 1.0370 |
| 2025-07-01 | 0.9905 |
| Capex total (greenfield) |
$50.26M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$966,626
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$826.7k
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$33,069
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.98
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026
Notes
Original greenfield battery project cost reported as ~A$38 million for the 25 MW / 52 MWh Lake Bonney Battery Energy Storage System. Funding included A$5 million from the SA Government and A$5 million from ARENA. No plant-specific refurbishment capex identified.