Hydro · Genex Power Ltd · Storage - Pumped hydro
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
| Capex total (greenfield) |
$966.42M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$483,209
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$13.99M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$55,970
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.49
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026
Notes
Genex states the project reached financial and contractual close in April 2021 with total funded construction cost of around A$777M. Genex also describes the project as 250MW for 8 hours (2,000MWh) and notes a project lifespan of 80 years. AEMO/Aurecon 2024 PHES and hydro review was used only as fallback context for operating assumptions; project-specific O&M data was not found.