Kidston Pumped Storage Hydro Project 250MW

Hydro · Genex Power Ltd · Storage - Pumped hydro

Development AEMO: Committed Hydro - Water NEM data · 24 hours
250/2,000 MW
Registered nameplate capacity / storage
Est. SRMC
$1.49/MWh
Key information
Capacity
250 MW / 2,000 MWh

AEMO status Committed
Project status Development (AI)

Coordinates

DUID
Owner Genex Power Ltd
Commissioned Jan 2026
Expected closure 2105
Closure date
Technology Storage - Pumped hydro
Fuel Hydro - Water
Turbine OEM
Turbine type / model
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Pumped hydro
Capacity
250 MW / 2,000 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.49/MWh
Capex total (greenfield)
$966.42M

Shown in table
$966.42M (2026 real AUD)

Reported / source value
$777.00M (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Owner-reported total funded construction cost for the Kidston pumped hydro project.

Reference
250MW Kidston Pumped Storage Hydro Project - Genex (high confidence)
Source recorded 09 Jun 2026

Capex refurbishment
Capex / MWh storage derived
$483,209

Shown in table
$483.2k (2026 real AUD)

Reported / source value
$388.5k (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated from owner-reported total project cost and storage capacity.

Reference
250MW Kidston Pumped Storage Hydro Project - Genex (high confidence)
Source recorded 09 Jun 2026

Fixed OPEX (annual)
$13.99M

Shown in table
$13.99M (2026 real AUD)

Reported / source value
$11.25M (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Annual fixed O&M derived from fallback per-MW assumption.

Fixed OPEX / MW-yr
$55,970

Shown in table
$56.0k (2026 real AUD)

Reported / source value
$45.0k (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific fixed O&M value was found; fallback default used.

Variable OPEX / MWh
$1.49

Shown in table
$1.49 (2026 real AUD)

Reported / source value
$1.20 (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific variable O&M value was found; fallback default used.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026

Notes
Genex states the project reached financial and contractual close in April 2021 with total funded construction cost of around A$777M. Genex also describes the project as 250MW for 8 hours (2,000MWh) and notes a project lifespan of 80 years. AEMO/Aurecon 2024 PHES and hydro review was used only as fallback context for operating assumptions; project-specific O&M data was not found.