13 Jun 2026 07:35 → 14 Jun 2026 07:35 AEST
| Capex total (greenfield) |
$29.54M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,219,409
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table |
| Variable OPEX / MWh |
$1.05
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026
Notes
Plant-specific greenfield capex could not be verified from owner/developer/government sources. Existing unit is an operating hydro asset, so greenfield construction capex is not estimated here. A refurbishment/upgrade program is noted by CleanCo (Kareeya Protection System Upgrade), but no public dollar value was found. Capacity for DUID KAREEYA5 was treated as 7 MW per user input for normalization, but public CleanCo references describe Kareeya Hydro as an 88 MW station made up of four 22 MW turbines.