Kareeya 5 (KAREEYA5)

Hydro · CleanCo Queensland Limited · Hydro - Dam

Operational AEMO: In Service QLD1 Hydro - Water NEM data · 24 hours
7 MW
Registered nameplate capacity
Est. SRMC
$1.05/MWh
Key information
Capacity
7 MW

AEMO status In Service
Project status Operational (AI)

Region QLD1
Coordinates

DUID KAREEYA5
Owner CleanCo Queensland Limited
Commissioned
Expected closure 2037
Closure date
Technology Hydro - Dam
Fuel Hydro - Water
Turbine OEM
Turbine type / model
Stats window
13 Jun 2026 07:35 → 14 Jun 2026 07:35 AEST

Dispatch & revenue

13 Jun 2026 07:35 → 14 Jun 2026 07:35 AEST

No dispatch data for DUID KAREEYA5 in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Hydro
Capacity
7 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.05/MWh
Capex total (greenfield)
$29.54M

Shown in table
$29.54M (2026 real AUD)

Reported / source value
$28.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$4,219,409

Shown in table
$4.22M (2026 real AUD)

Reported / source value
$4.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh
$1.05

Shown in table
$1.05 (2026 real AUD)

Reported / source value
$1.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026

Notes
Plant-specific greenfield capex could not be verified from owner/developer/government sources. Existing unit is an operating hydro asset, so greenfield construction capex is not estimated here. A refurbishment/upgrade program is noted by CleanCo (Kareeya Protection System Upgrade), but no public dollar value was found. Capacity for DUID KAREEYA5 was treated as 7 MW per user input for normalization, but public CleanCo references describe Kareeya Hydro as an 88 MW station made up of four 22 MW turbines.