Kareeya (KAREEYA2)

Hydro · CleanCo Queensland Limited · Hydro - Run of River

Operational AEMO: In Service QLD1 Hydro - Water NEM data · 7 days
22 MW
Registered nameplate capacity
7 days revenue
$248.3k
Capacity factor
94.2%
Revenue / MWh
$72.62
Est. SRMC
$1.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
22 MW

AEMO status In Service
Project status Operational (AI)

CleanCo Queensland hydro archive, 2024/2025: Kareeya Hydroelectric Power Station has been generating for more than 60 years and its four Pelton turbines produced electricity in 2024/25.

Region QLD1
Coordinates -17.76778, 145.57778 (AI)

Detailed Pedia/Wikipedia-style listing and GEO plant page: Kareeya Hydro Power Station coordinates 17°46′4″S 145°34′40″E / -17.76778, 145.57778.

MLF 0.9828
DUID KAREEYA2
Owner CleanCo Queensland Limited
Commissioned
Expected closure 2057
Closure date
Technology Hydro - Run of River
Fuel Hydro - Water
Turbine OEM Voith
Turbine type / model Pelton turbine
Equipment confidence medium
Stats window
06 Jun 2026 19:55 → 13 Jun 2026 19:55 AEST

Dispatch & revenue

06 Jun 2026 19:55 → 13 Jun 2026 19:55 AEST

Energy revenue (× MLF)
$248.3k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
3,418.9 MWh
Available
3,349.5 MWh
Curtailed
10.9 MWh
Curtailment
0.3%
of available
MLF used
0.9828
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9642
2025-07-01 0.9828

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Hydro
Capacity
22 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.00/MWh
Capex total (greenfield)
$122.94M

Shown in table
$122.94M (2026 real AUD)

Reported / source value
$86.40M (1957 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No official owner/developer/government construction cost announcement was located in the searches, so the fallback capex assumption was applied.

Capex refurbishment
Capex / MW derived
$5,691,793

Shown in table
$5.69M (2026 real AUD)

Reported / source value
$4.00M (1957 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$864.0k

Shown in table
$864.0k (2026 real AUD)

Reported / source value
$864.0k (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$40,000

Shown in table
$40.0k (2026 real AUD)

Reported / source value
$40.0k (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Internal default used because no plant-specific O&M benchmark was located in the searched sources.

Variable OPEX / MWh
$1.00

Shown in table
$1.00 (2026 real AUD)

Reported / source value
$1.00 (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Internal default used because no plant-specific variable O&M benchmark was located in the searched sources.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026

Notes
No plant-specific greenfield capex announcement or government/owner construction cost was found in the searched sources. CleanCo sources confirm Kareeya is run-of-river hydro, commissioned in 1957, with 88 MW capacity. In the absence of a reported project investment figure, default server-side capex assumptions were used. The site is a legacy asset, so capex_year reflects commissioning year rather than a construction cost year.