Hydro · Hydro-Electric Corporation · Hydro - Dam
Dispatch target (cleared) vs availability — 5‑minute intervals. TAS1 regional price (RRP) on right axis.
13 Jun 2026 06:10 → 14 Jun 2026 06:10 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9245 |
| 2025-07-01 | 0.9386 |
| Capex total (greenfield) |
$607.59M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
$4.10M
Shown in table Reported / source value How this was derived Reference |
| Capex / MW derived |
$4,219,409
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
Hydro Tasmania confirms John Butters Power Station was commissioned in 1992 and has 145 MW capacity; the user-provided 144 MW is close to this official figure. No plant-specific original greenfield construction cost was found in official or high-quality sources, so capex_total_aud remains null. A Hydro Tasmania annual report notes a $3.3 million project to replace original excitation, governor and protection systems on Reece Unit 1 and John Butters, which is treated here as a refurbishment/upgrade rather than greenfield capex.