Ilford Green Energy Hub

BESS · brightnightpower_NR · Storage - Battery

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner brightnightpower_NR
Commissioned Apr 2029
Expected closure
Closure date
Technology Storage - Battery
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
22 Jul 2026 07:20 → 23 Jul 2026 07:20 AEST

Dispatch & revenue

22 Jul 2026 07:20 → 23 Jul 2026 07:20 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MW
$1,127,049

Shown in table
$1.13M (2026 real AUD)

Reported / source value
$1.10M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$18,000

Shown in table
$18.0k (2026 real AUD)

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
No plant-specific capex announcement or owner/government project cost was found in the available web results for Ilford Green Energy Hub. The only source-backed capacity detail located was 360 MW / 300 MWh for the battery component and 176 MW for the co-located solar PV, with COD shown as 2029-04-01. Because no project-specific greenfield investment figure was found, capex remains null rather than using an AEMO benchmark. O&M and lifecycle assumptions for this specific project were not publicly sourced; battery technology defaults were not applied because the request requires sourced values where possible.