| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,127,049
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$18,000
Shown in table |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No plant-specific capex announcement or owner/government project cost was found in the available web results for Ilford Green Energy Hub. The only source-backed capacity detail located was 360 MW / 300 MWh for the battery component and 176 MW for the co-located solar PV, with COD shown as 2029-04-01. Because no project-specific greenfield investment figure was found, capex remains null rather than using an AEMO benchmark. O&M and lifecycle assumptions for this specific project were not publicly sourced; battery technology defaults were not applied because the request requires sourced values where possible.