Hydro · South East Water Corporation · Hydro - Dam
13 Jun 2026 05:55 → 14 Jun 2026 05:55 AEST
| Capex total (greenfield) |
$1.05M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,219,409
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$10.5k
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$42,194
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.05
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No plant-specific greenfield capex or refurbishment cost could be verified from owner, developer, or government sources in web search. Fallback operating assumptions use server defaults for hydro. AEMO records the unit as HLMSEW01 / Hallam Mini Hydro, but no construction cost was located.