Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
13 Jun 2026 02:10 → 14 Jun 2026 02:10 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9539 |
| 2025-07-01 | 0.9586 |
| Capex total (greenfield) |
$179.01M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
$92.59M
Shown in table Reported / source value How this was derived Reference |
| Capex / MW derived |
$6,172,840
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table |
| Variable OPEX / MWh |
$1.54
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No reliable plant-specific greenfield capex announcement for HUMEV / Hume Power Station was found in official owner or government sources. The only cost figure located was an estimated A$60 million dam upgrade program begun in 2010, which is refurbishment/brownfield work and therefore not used as original capex. Hume Power Station was commissioned in 1957 and has 58 MW total capacity on the owner site; the NEM listing shows HUMEV at 29 MW as a unit/site entry.