Hume Dam VIC (HUMEV)

Hydro · GSP Energy Pty Ltd · Hydro - Dam

Operational AEMO: In Service VIC1 Hydro - Water NEM data · 24 hours
29 MW
Registered nameplate capacity
24 hours revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$1.54/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
29 MW

AEMO status In Service
Project status Operational (AI)

Power Technology profile notes the Hume project was commissioned in 1957 and is in service as a hydro station.

Region VIC1
Coordinates -36.10670, 147.03270 (AI)

Global Energy Observatory lists Hume Dam Hydroelectric Power Station at latitude -36.1067, longitude 147.0327.

MLF 0.9586
DUID HUMEV
Owner GSP Energy Pty Ltd
Commissioned
Expected closure 2057
Closure date
Technology Hydro - Dam
Fuel Hydro - Water
Turbine OEM English Electric
Turbine type / model Kaplan turbine
Equipment confidence high
Stats window
13 Jun 2026 02:10 → 14 Jun 2026 02:10 AEST

Dispatch & revenue

13 Jun 2026 02:10 → 14 Jun 2026 02:10 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9586
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9539
2025-07-01 0.9586

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Hydro
Capacity
29 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.54/MWh
Capex total (greenfield)
$179.01M

Shown in table
$179.01M (2026 real AUD)

Reported / source value
$116.00M (2010 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
$92.59M

Shown in table
$92.59M (2026 real AUD)

Reported / source value
$60.00M (2010 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Secondary-source statement about a 2010 dam upgrade program cost; treated as refurbishment, not original capex.

Reference
Hume Dam - Wikipedia mirror (low confidence)
Source recorded 08 Jun 2026

Capex / MW derived
$6,172,840

Shown in table
$6.17M (2026 real AUD)

Reported / source value
$4.00M (2010 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh
$1.54

Shown in table
$1.54 (2026 real AUD)

Reported / source value
$1.00 (2010 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side default retained due to missing plant-specific or benchmark hydro value.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
No reliable plant-specific greenfield capex announcement for HUMEV / Hume Power Station was found in official owner or government sources. The only cost figure located was an estimated A$60 million dam upgrade program begun in 2010, which is refurbishment/brownfield work and therefore not used as original capex. Hume Power Station was commissioned in 1957 and has 58 MW total capacity on the owner site; the NEM listing shows HUMEV at 29 MW as a unit/site entry.

Sources