Hume Dam NSW (HUMENSW)

Hydro · GSPOWER · Hydro - Dam

Operational AEMO: In Service NSW1 Hydro - Water NEM data · 22h
29 MW
Registered nameplate capacity
22h revenue
$-13
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$1.05/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
29 MW

AEMO status In Service
Project status Operational (AI)

Power Technology / GlobalData profile (2024): Hume project commissioned in 1957 and currently active.

Region NSW1
Coordinates -36.10670, 147.03270 (AI)

Global Energy Observatory: Hume Dam Hydroelectric Power Station coordinates listed as latitude -36.1067, longitude 147.0327.

MLF 0.9316
DUID HUMENSW
Owner GSPOWER
Commissioned
Expected closure 2057
Closure date
Technology Hydro - Dam
Fuel Hydro - Water
Turbine OEM English Electric
Turbine type / model Kaplan turbine
Equipment confidence high
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 22:00 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 22:00 AEST

Energy revenue (× MLF)
$-13
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
-0.3 MWh
Available
MWh
Curtailed
0.3 MWh
Curtailment
of available
MLF used
0.9316
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8975
2025-07-01 0.9316

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Hydro
Capacity
29 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.05/MWh
Capex total (greenfield)
$122.36M

Shown in table
$122.36M (2026 real AUD)

Reported / source value
$116.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific greenfield construction/investment cost was located in the reviewed official/primary sources.

Capex refurbishment
Capex / MW derived
$4,219,409

Shown in table
$4.22M (2026 real AUD)

Reported / source value
$4.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh
$1.05

Shown in table
$1.05 (2026 real AUD)

Reported / source value
$1.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
Hume Power Station at Hume Dam is listed by GSP Energy as a 58 MW hydro station with two 29 MW Kaplan units and commissioning in 1957. I did not find a plant-specific original construction/investment cost for this DUID/asset in the reviewed sources, so capex remains unfilled rather than inferred from benchmarks. A separate Hume Battery Energy Storage System project exists within the Hume Dam precinct, but that is not the hydro generator's greenfield capex.

Sources