Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
14 May 2026 20:15 → 13 Jun 2026 20:15 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.8975 |
| 2025-07-01 | 0.9316 |
| Capex total (greenfield) |
$122.36M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,219,409
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table |
| Variable OPEX / MWh |
$1.05
Shown in table Reported / source value |
| Fuel cost / GJ |
$0.00
Shown in table Reported / source value |
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
Hume Power Station at Hume Dam is listed by GSP Energy as a 58 MW hydro station with two 29 MW Kaplan units and commissioning in 1957. I did not find a plant-specific original construction/investment cost for this DUID/asset in the reviewed sources, so capex remains unfilled rather than inferred from benchmarks. A separate Hume Battery Energy Storage System project exists within the Hume Dam precinct, but that is not the hydro generator's greenfield capex.