150/178 MW
Registered nameplate capacity / storage
24 hours revenue
$520
Capacity factor
-2.1%
Revenue / MWh
Est. SRMC
$1.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
150 MW / 178 MWh

AEMO status In Service
Project status Operational (AI)

ARENA 2019 project overview; Hornsdale Power Reserve was installed/operated and later expanded, with 2022 Tesla grid-forming upgrade article confirming ongoing service.

Region SA1
Coordinates -33.08698, 138.51834 (AI)

Wikidata coordinate location for Hornsdale Power Reserve (33°5'9.13"S, 138°31'6.02"E).

MLF 0.9806
DUID HPR1
Owner Hornsdale Power Reserve Pty Ltd
Commissioned Jul 2020
Expected closure 2057
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM Tesla
Battery platform / chemistry Li-ion battery / Powerpack
Inverter OEM Tesla
Inverter / PCS model Tesla inverter / PCS (189 Tesla inverters; model not documented)
Equipment confidence high
Stats window
12 Jun 2026 19:55 → 13 Jun 2026 19:55 AEST

Dispatch & revenue

12 Jun 2026 19:55 → 13 Jun 2026 19:55 AEST

Energy revenue (× MLF)
$520
FCAS revenue (× MLF)
$31
FCAS volume
51.3 MWh
Dispatched
-75.2 MWh
Available
653.3 MWh
Curtailed
729.3 MWh
Curtailment
111.6%
of available
MLF used
0.9806
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-09-12 0.9625
2025-07-01 0.9806

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
150 MW / 178 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
$65.83M

Shown in table
$65.83M (2026 real AUD)

Reported / source value
$62.41M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MWh storage derived
$369,198

Shown in table
$369.2k (2026 real AUD)

Reported / source value
$350.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$759.5k

Shown in table
$759.5k (2026 real AUD)

Reported / source value
$720.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$5,063

Shown in table
$5.1k (2026 real AUD)

Reported / source value
$4.8k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Published benchmark for the large-scale Li-ion BESS case; variable O&M is not separately specified.

Reference
2023 Cost and Technical Parameters Review Final Report (medium confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
No plant-specific greenfield capex figure was found in owner/developer or government search results. Hornsdale Power Reserve was completed in two phases: 100 MW/129 MWh in 2017 and a 50 MW/64.5 MWh expansion completed in 2020, bringing total capacity to 150 MW. For battery O&M, the 2024 AEMO/Aurecon review indicates BESS long-term service agreements are not typically based on fixed/variable O&M; the closest published benchmark found was an annual fixed O&M of $4,800/MW-yr for the smallest large-scale Li-ion BESS case in the 2023/24 review. No fuel or heat-rate assumptions apply.