BESS · Hornsdale Power Reserve Pty Ltd · Storage - Battery
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
12 Jun 2026 16:45 → 13 Jun 2026 16:45 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-09-12 | 0.9625 |
| 2025-07-01 | 0.9806 |
| Capex total (greenfield) |
$65.83M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$759.5k
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$5,063
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No plant-specific greenfield capex figure was found in owner/developer or government search results. Hornsdale Power Reserve was completed in two phases: 100 MW/129 MWh in 2017 and a 50 MW/64.5 MWh expansion completed in 2020, bringing total capacity to 150 MW. For battery O&M, the 2024 AEMO/Aurecon review indicates BESS long-term service agreements are not typically based on fixed/variable O&M; the closest published benchmark found was an annual fixed O&M of $4,800/MW-yr for the smallest large-scale Li-ion BESS case in the 2023/24 review. No fuel or heat-rate assumptions apply.