Guthega (GUTHEGA)

Hydro · Snowy Hydro Ltd · Hydro - Dam

Operational AEMO: In Service NSW1 Hydro - Water NEM data · 24 hours
60 MW
Registered nameplate capacity
24 hours revenue
$9.0k
Capacity factor
9.6%
Revenue / MWh
$65.21
Est. SRMC
$1.05/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
60 MW

AEMO status In Service
Project status Operational (AI)

Snowy Hydro Guthega power station page (2020) describes Guthega as an existing power station in the Snowy scheme; AEMO lists it In Service, indicating full commercial operation.

Region NSW1
Coordinates -36.35132, 148.41358 (AI)

National Public Toilet Map coordinates for Guthega Power Station (-36.35131978, 148.41357999); Snowy Hydro Guthega page.

MLF 0.9135
DUID GUTHEGA
Owner Snowy Hydro Ltd
Commissioned
Expected closure 2070
Closure date
Technology Hydro - Dam
Fuel Hydro - Water
Turbine OEM Andritz Hydro
Turbine type / model conventional hydroelectric turbine-generator units; likely Francis-type
Equipment confidence medium
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST

Energy revenue (× MLF)
$9.0k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
137.9 MWh
Available
277.7 MWh
Curtailed
215.7 MWh
Curtailment
77.7%
of available
MLF used
0.9135
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8920
2025-07-01 0.9135

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Hydro
Capacity
60 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.05/MWh
Capex total (greenfield)
$253.16M

Shown in table
$253.16M (2026 real AUD)

Reported / source value
$240.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific greenfield construction cost found in the searched official sources.

Capex refurbishment
$17.57M

Shown in table
$17.57M (2026 real AUD)

Reported / source value
$13.00M (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Official owner announcement of a brownfield generator replacement at Guthega; suitable only as refurbishment capex, not greenfield construction cost.

Reference
Snowy Mountains Scheme Archives - Snowy Hydro (high confidence)
Source recorded 08 Jun 2026

Capex / MW derived
$4,219,409

Shown in table
$4.22M (2026 real AUD)

Reported / source value
$4.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh
$1.05

Shown in table
$1.05 (2026 real AUD)

Reported / source value
$1.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
No plant-specific greenfield construction cost for Guthega was found in official owner/government sources during search. Snowy Hydro sources confirm Guthega is a 60 MW, 2-unit hydro station commissioned in 1955. A Snowy Hydro announcement in 2017 reported a $13 million generator replacement project for Unit 1 at Guthega; this is a brownfield refurbishment, not greenfield capex.

Sources