Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
13 Jun 2026 08:35 → 14 Jun 2026 08:35 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-12-17 | 1.0033 |
| 2025-07-01 | 1.0045 |
| Capex total (greenfield) |
$307.38M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$768,443
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$3.28M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$16,393
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$1.54
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Plant-specific reported capex found in CS Energy fact sheet: $300 million investment for the 200 MW/400 MWh Greenbank Battery, commissioned in June 2025. Fixed O&M not explicitly published for this asset; used AEMO 2024 BESS indicative annual fixed O&M excluding extended warranties of $1.8m-$7.46m total annual O&M across size cases, selecting a midpoint-style proxy of ~$16,000/MW-yr for a 200 MW battery as a fallback estimate. Variable O&M is typically treated as negligible for BESS long-term service agreements; a small default of $1.50/MWh was retained from server-side fallback. No fuel or heat rate applies.