Dispatch target (cleared) vs availability — 5‑minute intervals. TAS1 regional price (RRP) on right axis.
07 Jun 2026 05:30 → 14 Jun 2026 05:30 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9622 |
| 2025-07-01 | 0.9594 |
| Capex total (greenfield) |
$1,822.78M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
$82.28M
Shown in table Reported / source value How this was derived Reference |
| Capex / MW derived |
$4,219,409
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$105.5k
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$244
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$1.05
Shown in table Reported / source value |
| Fuel cost / GJ |
$0.00
Shown in table Reported / source value |
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No plant-specific greenfield construction cost was found for Gordon/DUID GORDON in official owner or government sources. The available official sources instead document a major refurbishment program: Hydro Tasmania stated in August 2024 that $78 million of works will refurbish two of the three turbines and add around 30 years of life; in February 2026 the project page listed machine upgrades and MIV replacements across 2024-2033. Gordon Power Station is 432 MW and was commissioned between 1977 and 1988.