12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST
| Capex total (greenfield) |
$542.33M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$45,000
Shown in table |
| Variable OPEX / MWh |
$1.59
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Plant-specific investment figure found in secondary project profile sources. Capacity/stored energy values vary across sources: 230 MW / 1,840 MWh in some project listings vs 250 MW / 2,000 MWh in other references; capex_per_mw_aud and capex_per_mwh_aud are calculated using 230 MW and 2,000 MWh respectively to keep the cost figure consistent with the cited reported investment. Project status appears to have changed/cancelled in some sources, so operating assumptions are not well verified.