Hydro · Water NSW · Storage - Pumped hydro
07 Jun 2026 05:55 → 14 Jun 2026 05:55 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage default |
$200,000
Shown in table |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$47,468
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.27
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: unknown · AI checked 08 Jun 2026
Notes
No project-specific greenfield capex announcement was found in official owner/government sources. Available sources indicate the Glennies Creek project is an early-development pumped hydro scheme at Glennies Creek Dam in NSW, initially progressed by Upper Hunter Hydro under WaterNSW and later acquired by AGL in May 2025. Capacity is reported as 623 MW / 6,200 MWh on current designs. Internal fallback capex was not used as reported capex because no verified plant-specific total project investment was located. Pumped hydro has no fuel cost or heat rate; emissions operational intensity assumed zero.