Glennis Creek Pumped Hydro Project

Hydro · Water NSW · Storage - Pumped hydro

Development AEMO: Publicly Announced Hydro - Water NEM data · 24 hours
—
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.27/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates —

DUID —
Owner Water NSW
Commissioned —
Expected closure —
Closure date —
Technology Storage - Pumped hydro
Fuel Hydro - Water
Turbine OEM —
Turbine type / model —
Stats window
24 Sep 2026 06:55 → 25 Sep 2026 06:55 AEST

Dispatch & revenue

24 Sep 2026 06:55 → 25 Sep 2026 06:55 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Pumped hydro
Capacity
—
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.27/MWh
Capex total (greenfield)
—
Capex refurbishment
—
Capex / MWh storage default
$200,000

Shown in table
$200.0k (2026 real AUD)

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr
$47,468

Shown in table
$47.5k (2026 real AUD)

Reported / source value
$45.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific O&M benchmark was found in the searched sources, so fallback default used.

Variable OPEX / MWh
$1.27

Shown in table
$1.27 (2026 real AUD)

Reported / source value
$1.20 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M benchmark was found in the searched sources, so fallback default used.

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: low · Status: ai estimated · Capex basis: unknown · AI checked 08 Jun 2026

Notes
No project-specific greenfield capex announcement was found in official owner/government sources. Available sources indicate the Glennies Creek project is an early-development pumped hydro scheme at Glennies Creek Dam in NSW, initially progressed by Upper Hunter Hydro under WaterNSW and later acquired by AGL in May 2025. Capacity is reported as 623 MW / 6,200 MWh on current designs. Internal fallback capex was not used as reported capex because no verified plant-specific total project investment was located. Pumped hydro has no fuel cost or heat rate; emissions operational intensity assumed zero.

Sources