Glenmaggie Hydro (GLENMAG1)

Hydro · Pacific Hydro Investments Pty Ltd · Hydro - Dam

Operational AEMO: In Service VIC1 Hydro - Water NEM data · 24 hours
2 MW
Registered nameplate capacity
Est. SRMC
$1.00/MWh
Key information
Capacity
2 MW

AEMO status In Service
Project status Operational (AI)

Region VIC1
Coordinates

DUID GLENMAG1
Owner Pacific Hydro Investments Pty Ltd
Commissioned
Expected closure 2044
Closure date
Technology Hydro - Dam
Fuel Hydro - Water
Turbine OEM
Turbine type / model
Stats window
13 Jun 2026 09:20 → 14 Jun 2026 09:20 AEST

Dispatch & revenue

13 Jun 2026 09:20 → 14 Jun 2026 09:20 AEST

No dispatch data for DUID GLENMAG1 in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Hydro
Capacity
2 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.00/MWh
Capex total (greenfield)
$8.02M

Shown in table
$8.02M (2026 real AUD)

Reported / source value
$7.60M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$4,219,409

Shown in table
$4.22M (2026 real AUD)

Reported / source value
$4.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh default
$1.00

Shown in table
$1.00 (2026 real AUD)

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Heat rate GJ/MWh
0.00

Shown in table
$0.00 (2026 real AUD)

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
Plant-specific greenfield capex could not be found in searched official or high-quality sources. Pacific Blue states construction began in 1993 and the trio of Victorian hydro plants including Glenmaggie were completed in 1994, but no total project cost was located. Operating assumptions defaulted to hydro with zero fuel cost and zero direct emissions.

Sources