Glenbawn Pumped Hydro Project

Hydro · Water NSW · Storage - Pumped hydro

Development AEMO: Publicly Announced Hydro - Water NEM data · 14h
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.20/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Water NSW
Commissioned
Expected closure
Closure date
Technology Storage - Pumped hydro
Fuel Hydro - Water
Turbine OEM
Turbine type / model
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 14:05 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 14:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Pumped hydro
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.20/MWh
Capex total (greenfield)

How this was derived
Project is described as early-stage; no investment figure is provided in the announcement.

Reference
AGL acquires Upper Hunter pumped hydro projects (medium confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MWh storage
$204,918

Shown in table
$204.9k (2026 real AUD)

Reported / source value
$200.0k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$45,000

Shown in table
$45.0k (2026 real AUD)

How this was derived
Used server-side fallback only because no project-specific O&M source was found.

Variable OPEX / MWh default
$1.20

Shown in table
$1.20 (2026 real AUD)

How this was derived
Used server-side fallback only because no project-specific O&M source was found.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
I could confirm the project is proposed at Glenbawn reservoirs under WaterNSW / AGL, with current design of 770 MW and 10-hour storage (7,700 MWh). I did not find a plant-specific greenfield capex announcement for Glenbawn, so no capex total was populated. WaterNSW and AGL materials describe the project as early-stage / proposed, and WaterNSW notes geotechnical investigations are expected to start in November 2025, indicating it is not yet commissioned.