15 May 2026 07:55 → 14 Jun 2026 07:55 AEST
| Capex total (greenfield) |
$21.10M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,219,409
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table |
| Variable OPEX / MWh default |
$1.00
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
AGL identifies Glenbawn Power Station as a 5.5 MW hydro station built in 1995 within the Glenbawn Dam wall structure, with average annual output of 12 GWh. WaterNSW states the station uses irrigation, flood mitigation and environmental flows. No plant-specific greenfield capex or refurbishment cost was found in the searched official sources, so capex remains unknown rather than using a benchmark. The developer also announced in 2025 that AGL acquired the Glenbawn pumped hydro project; that is a different proposed project and not the existing GLBWNHYD unit.