BESS · GESS ProjectCo · Storage - Battery
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-18 | 0.9597 |
| 2025-07-01 | 0.9857 |
| Capex total (greenfield) |
$54.89M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$1,097,884
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$335.1k
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$13,228
Shown in table Reported / source value |
| Variable OPEX / MWh |
$1.98
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
GESS is a retrofit battery behind the existing point of connection of the Gannawarra Solar Farm. ARENA’s project summary identifies the battery as 25 MW / 50 MWh, completed 30 January 2022 / commenced operations in March 2019, and owned/operated by GESS ProjectCo Pty Ltd. The project summary report states the project was financed by Edify in a consortium with WIRCON as 50-50 joint venture co-investors and that ARENA and DELWP provided $25 million in grant funding. No reliable source found for a standalone greenfield total project cost for the battery itself; capex_total_aud is therefore inferred from the $25 million public grant plus an estimated matching private contribution, and should be reviewed if a project-specific investment figure becomes available.