Gannawarra Energy Storage System (GANNB1)

BESS · GESS ProjectCo · Storage - Battery

Operational AEMO: In Service VIC1 Other - Other NEM data · 30 days
25/50 MW
Registered nameplate capacity / storage
30 days revenue
$22.4k
Capacity factor
-0.7%
Revenue / MWh
Est. SRMC
$1.98/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
25 MW / 50 MWh

AEMO status In Service
Project status Operational (AI)

ARENA project page states the battery project was completed on 30 January 2022; EnergyAustralia describes it as the Gannawarra Battery Storage in service.

Region VIC1
Coordinates -35.73667, 143.78000 (AI)

Wikidata coordinate location 35°44'2"S, 143°46'48"E; project is west of Kerang, Victoria.

MLF 0.9857
DUID GANNB1
Owner GESS ProjectCo
Commissioned
Expected closure 2033
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM Tesla
Battery platform / chemistry Tesla Powerpack
Inverter OEM
Inverter / PCS model
Equipment confidence high
Stats window
14 May 2026 22:25 → 13 Jun 2026 22:25 AEST

Dispatch & revenue

14 May 2026 22:25 → 13 Jun 2026 22:25 AEST

Energy revenue (× MLF)
$22.4k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
-132.6 MWh
Available
4,379.7 MWh
Curtailed
4,519.0 MWh
Curtailment
103.2%
of available
MLF used
0.9857
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-18 0.9597
2025-07-01 0.9857

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
25 MW / 50 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.98/MWh
Capex total (greenfield)
$54.89M

Shown in table
$54.89M (2026 real AUD)

Reported / source value
$41.50M (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MWh storage derived
$1,097,884

Shown in table
$1.10M (2026 real AUD)

Reported / source value
$830.0k (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$335.1k

Shown in table
$335.1k (2026 real AUD)

Reported / source value
$250.0k (2018 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

Fixed OPEX / MW-yr
$13,228

Shown in table
$13.2k (2026 real AUD)

Reported / source value
$10.0k (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$1.98

Shown in table
$1.98 (2026 real AUD)

Reported / source value
$1.50 (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
GESS is a retrofit battery behind the existing point of connection of the Gannawarra Solar Farm. ARENA’s project summary identifies the battery as 25 MW / 50 MWh, completed 30 January 2022 / commenced operations in March 2019, and owned/operated by GESS ProjectCo Pty Ltd. The project summary report states the project was financed by Edify in a consortium with WIRCON as 50-50 joint venture co-investors and that ARENA and DELWP provided $25 million in grant funding. No reliable source found for a standalone greenfield total project cost for the battery itself; capex_total_aud is therefore inferred from the $25 million public grant plus an estimated matching private contribution, and should be reviewed if a project-specific investment figure becomes available.