Fisher (FISHER)

Hydro · Hydro-Electric Corporation · Hydro - Dam

Operational AEMO: In Service TAS1 Hydro - Water NEM data · 24 hours
43 MW
Registered nameplate capacity
24 hours revenue
$75.0k
Capacity factor
100.0%
Revenue / MWh
$67.97
Est. SRMC
$1.05/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. TAS1 regional price (RRP) on right axis.

Key information
Capacity
43 MW

AEMO status In Service
Project status Operational (AI)

GEO/Global Energy Observatory lists Fisher Hydroelectric Power Station as commissioned in 1973 and operating in Tasmania.

Region TAS1
Coordinates -41.67320, 146.26860 (AI)

Global Energy Observatory coordinates for Fisher Hydroelectric Power Station, Tasmania.

MLF 0.9533
DUID FISHER
Owner Hydro-Electric Corporation
Commissioned
Expected closure 2100
Closure date
Technology Hydro - Dam
Fuel Hydro - Water
Turbine OEM ANDRITZ
Turbine type / model Francis turbine
Equipment confidence low
Stats window
12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST

Dispatch & revenue

12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST

Energy revenue (× MLF)
$75.0k
FCAS revenue (× MLF)
$714
FCAS volume
240.4 MWh
Dispatched
1,103.9 MWh
Available
1,104.0 MWh
Curtailed
0.1 MWh
Curtailment
0.0%
of available
MLF used
0.9533
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9642
2025-07-01 0.9533

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Hydro
Capacity
43 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.05/MWh
Capex total (greenfield)
$182.28M

Shown in table
$182.28M (2026 real AUD)

Reported / source value
$172.80M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$4,219,409

Shown in table
$4.22M (2026 real AUD)

Reported / source value
$4.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

How this was derived
AEMO/Aurecon includes hydro-electric schemes in its technology-cost dataset, but the accessible excerpts here did not expose a Fisher-specific fixed O&M value.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 07 Jun 2026

Variable OPEX / MWh
$1.05

Shown in table
$1.05 (2026 real AUD)

Reported / source value
$1.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
User-provided internal technology default retained because no plant-specific variable O&M was found in the searched sources.

Fuel cost / GJ

How this was derived
Hydro stations consume water flow rather than purchased fuel.

Reference
Mersey-Forth (high confidence)
Source recorded 07 Jun 2026

Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026

Notes
Plant-specific greenfield capex for Fisher was not found in the searched official owner/government sources. Hydro Tasmania states the Mersey-Forth scheme (which includes Fisher) was commissioned in 1972, and the Fisher power station entry in Hydro Tasmania's Mersey-Forth water management review shows Fisher commissioned in 1973 with 46 MW. Hydro Tasmania also states the final power station in the Mersey-Forth upgrade sequence is Fisher, with works due to start in 2027. A plant-specific refurbishment cost for Fisher was not located; the 2026 Mersey-Forth upgrade context suggests refurbishment may be forthcoming, but no Fisher-specific cost was identified in official sources.