Dispatch target (cleared) vs availability — 5‑minute intervals. TAS1 regional price (RRP) on right axis.
12 Jun 2026 19:50 → 13 Jun 2026 19:50 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9642 |
| 2025-07-01 | 0.9533 |
| Capex total (greenfield) |
$182.28M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,219,409
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table How this was derived Reference |
| Variable OPEX / MWh |
$1.05
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
How this was derived Reference |
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
Plant-specific greenfield capex for Fisher was not found in the searched official owner/government sources. Hydro Tasmania states the Mersey-Forth scheme (which includes Fisher) was commissioned in 1972, and the Fisher power station entry in Hydro Tasmania's Mersey-Forth water management review shows Fisher commissioned in 1973 with 46 MW. Hydro Tasmania also states the final power station in the Mersey-Forth upgrade sequence is Fisher, with works due to start in 2027. A plant-specific refurbishment cost for Fisher was not located; the 2026 Mersey-Forth upgrade context suggests refurbishment may be forthcoming, but no Fisher-specific cost was identified in official sources.