BESS · unitedgreen_NR · Storage - Battery
22 Jul 2026 00:00 → 22 Jul 2026 23:59 AEST
| Capex total (greenfield) |
—
How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
No plant-specific greenfield capex announcement or owner/developer source was found for Eurimbula Hybrid Facility - Battery Storage. AEMO battery benchmarks were found but not used because the instructions require plant-specific capex first. Capacity and storage duration were not provided, so per-MW and per-MWh values could not be calculated. The commissioned date supplied by the user is 2026-06-01, which is in the future relative to the current date.