BESS · Origin Energy Electricity Limited · Storage - Battery
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
14 Jun 2026 00:00 → 14 Jun 2026 05:15 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2025-03-04 | 0.9925 |
| 2025-07-01 | 0.9901 |
| Capex total (greenfield) |
$474.68M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$460,858
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$4.05M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$16,878
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Plant-specific greenfield investment for the 240 MW / 1,030 MWh second stage of Eraring Big Battery was reported by industry coverage as AU$450 million. This is treated as the project capex for ERB01. For operating assumptions, AEMO/GHD draft 2025 technology review gives fixed O&M of AU$16,000/MW-year for a 4-hour large-scale lithium-ion BESS, implying AU$3.84 million/year for 240 MW. No plant-specific fuel, heat rate, or emissions assumptions apply to a battery.