Hydro · Pacific Hydro Investments Pty Ltd · Hydro - Run of River
13 Jun 2026 02:50 → 14 Jun 2026 02:50 AEST
| Capex total (greenfield) |
$30.43M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$6,763,285
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$391.3k
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$86,957
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$2.17
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
How this was derived Reference |
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026
Notes
Plant-specific construction cost found in secondary source as A$14 million; no primary owner announcement located in search results. Commissioning/completion year taken as 1995 from multiple secondary and owner sources; Pacific Blue states construction began in 1993 and the Eildon Pondage project was completed in 1994, while other references cite installation/opening in 1995, so capex_year is set conservatively to 1995. Fixed O&M and variable O&M use the provided server-side hydro defaults due to lack of plant-specific operating cost disclosures. Hydro has no fuel cost and zero direct operational emissions.