Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
12 Jun 2026 15:25 → 13 Jun 2026 15:25 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9912 |
| 2025-07-01 | 0.9945 |
| Capex total (greenfield) |
$284.81M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
$30.57M
Shown in table Reported / source value How this was derived Reference |
| Capex / MW derived |
$4,219,409
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table How this was derived Reference |
| Variable OPEX / MWh default |
$1.00
Shown in table How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
No plant-specific greenfield construction cost for Eildon/EILDON2 was found in owner, government, or market sources. AGL states Eildon has 120 MW capacity and about 184 GWh average annual output, and that AGL Hydro is spending $28 million on maintenance and capital upgrades across its hydro assets including Eildon in FY2024/2025 preparation. Because this is a maintenance/capital-upgrade statement rather than original build cost, it is recorded only as refurbishment/upgrade context, not capex_total_aud. For fallback hydro economics, AEMO/Aurecon 2024 hydropower assumptions indicate fixed O&M of $105,000 per MW-year, variable O&M included in fixed, technical life 80-100 years, and no fuel cost/heat rate for hydropower.