Hydro · Dungowan Pumped Hydro Pty Ltd · Storage - Pumped hydro
12 Jun 2026 22:30 → 13 Jun 2026 22:30 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$264,550
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$6.35M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$21,164
Shown in table Reported / source value |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
The searched sources did not disclose a project-specific greenfield construction cost for Dungowan PHES. AEMO/Entura pumped hydro O&M guidance indicates fixed O&M only is appropriate for hydropower and gives a benchmark of $16,000/MW/yr (2018 AUD). Using the provided internal default capacity of 300 MW, fixed OPEX is estimated at A$4.8 million per year. Project status and owner/developer information were verified from EDF Dungowan project pages.