BESS · DPESS Pty Ltd · Storage - Battery
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-18 | 0.8774 |
| 2025-07-01 | 0.9453 |
| Capex total (greenfield) |
$37.78M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$755,607
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$337.6k
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$13,502
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Plant-specific total project cost reported by ARENA for the 25 MW / 50 MWh Darlington Point Energy Storage System. The ARENA project page lists $32.34m total project cost, with Edify Energy operating as DPESS DevCo. For O&M, AEMO/Aurecon 2024 benchmark for a co-located 4-hour BESS was used as the closest available template; there was no site-specific O&M figure located. BESS benchmark values are for a hypothetical 200 MW plant, so the per-MW O&M assumption is a scaled benchmark, not a reported project value. Efficiency and life assumptions are from AEMO/Aurecon BESS technical parameters.