Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-12 | 0.9005 |
| 2025-07-01 | 0.9337 |
| Capex total (greenfield) |
$40.54M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$4,504,505
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh |
$2.03
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
ARENA and ElectraNet described the Dalrymple/ESCRI battery as a $30 million, 30 MW / 8 MWh project built at the Dalrymple substation. No separate plant-specific fixed O&M figure was found in the searched sources, so fixed O&M remains unset. The commissioned date in sources is April 2018 / official completion January 2019; capex_year is set to the announcement/construction year 2017 per the source language. For the requested normalised type, this is a battery storage asset; the energy figure in some sources is 8 MWh, while a later ARENA report refers to 12.2 MWh BOL.