07 Jun 2026 01:45 → 14 Jun 2026 01:45 AEST
| Capex total (greenfield) |
$84.39M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,219,409
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table |
| Variable OPEX / MWh default |
$1.00
Shown in table |
| Fuel cost / GJ |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
AGL identifies Copeton as its largest hydroelectric power station in New South Wales and states it has a maximum output of 20 MW in one report, while another AGL page lists 22.5 MW total capacity for the Copeton Power Station scheme. No plant-specific greenfield construction/investment cost was found in official owner or government sources, so capex remains unfilled pending further verification. The site is an existing hydro dam-linked station; any future refurbishment capex was not identified in the searched sources.