Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
15 May 2026 01:05 → 14 Jun 2026 01:05 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 1.0284 |
| 2025-07-01 | 1.0191 |
| Capex total (greenfield) |
$46.73M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
How this was derived Reference |
| Capex / MW derived |
$1,611,344
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.36M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$46,729
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.17
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
AGL stated Clover was commissioned in 1945 and announced a nearly $50 million upgrade to the station in 2022. The figure appears to cover the Clover modernisation project, not original greenfield construction. AEMO later cited Clover's upgrade as providing an additional 14 MW at a cost of $40M or $2.9M/MW. Fixed O&M and other non-site-specific operating assumptions use the server-side fallback defaults because no plant-specific hydro O&M benchmark was identified in the searched sources.