BESS · Pacific Hydro Clements Gap Pty Ltd · Storage - Battery
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
21 Jul 2026 19:40 → 22 Jul 2026 19:40 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
Stored energy at the start of each 5‑minute interval (AEMO INITIAL_ENERGY_STORAGE).
Available up to the latest next‑day dispatch file.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.| Effective from | MLF |
|---|---|
| 2025-12-18 | 0.9992 |
| 2026-07-01 | 1.0164 |
| Capex total (greenfield) |
$105.49M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$879,044
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$1.58M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$26,371
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Pacific Blue stated the project is a $100 million, 60 MW / 130 MWh grid-scale battery at Clements Gap; this is a reported project investment figure. Later Pacific Blue material describes the battery as 60 MW / 120 MWh, so the reported cost is paired here with the announced 60 MW project capacity and the 2024 construction start year. Operational lifespan noted by Pacific Blue is 20 years.