Christies Beach Wastewater Treatment Plant (CBWWBA1)

BESS · South Australian Water Corporation · Storage - Battery

Commissioning AEMO: In Commissioning SA1 Other - Other NEM data · 24 hours
2/4 MW
Registered nameplate capacity / storage
24 hours revenue
$129
Capacity factor
3.5%
Revenue / MWh
$70.69
Est. SRMC
$1.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
2 MW / 4 MWh

AEMO status In Commissioning
Project status Commissioning (AI)

ESCOSA 2021: SA Water Christies Beach Waste Water Treatment Plant electricity generation licence variation application indicates the project was in build/commissioning context.

Region SA1
Coordinates

MLF 1.0037
DUID CBWWBA1
Owner South Australian Water Corporation
Commissioned Jan 2023
Expected closure 2041
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry Battery / BESS
Inverter OEM
Inverter / PCS model
Equipment confidence low
Stats window
13 Jun 2026 07:10 → 14 Jun 2026 07:10 AEST

Dispatch & revenue

13 Jun 2026 07:10 → 14 Jun 2026 07:10 AEST

Energy revenue (× MLF)
$129
FCAS revenue (× MLF)
$3
FCAS volume
0.3 MWh
Dispatched
1.8 MWh
Available
42.0 MWh
Curtailed
40.2 MWh
Curtailment
95.6%
of available
MLF used
1.0037
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-09-06 1.0025
2025-07-01 1.0037

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
2 MW / 4 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
$1.59M

Shown in table
$1.59M (2026 real AUD)

Reported / source value
$1.51M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MWh storage derived
$369,198

Shown in table
$369.2k (2026 real AUD)

Reported / source value
$350.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
No plant-specific public source for the Christies Beach Wastewater Treatment Plant battery construction cost, O&M, or performance parameters was found in the searched official SA Water sources. SA Water does state it has installed solar panels and battery storage on some existing land and facilities as part of its Zero-Cost Energy Future program, but the searched results did not identify this DUID's battery project cost or a battery-specific asset breakdown for Christies Beach. The site is part of SA Water's broader wastewater operations; the plant itself began operating in 1970 and was significantly upgraded in 2013. Because no verified plant-specific capex was found, no capex estimate was substituted.