Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
12 Jun 2026 13:10 → 13 Jun 2026 13:10 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-10-18 | 0.9761 |
| 2025-07-01 | 0.9875 |
| Capex total (greenfield) |
$175.23M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$876,168
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
How this was derived Reference |
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh |
$1.75
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Plant-specific reported greenfield investment of $150 million including substation works. Operated commercially from July 2024. No reliable plant-specific fixed O&M, asset life, or battery efficiency figure was found in the searched sources; server-side fallback should only be used if allowed downstream.