Chinchilla BESS (CHBESS1)

BESS · CSE BESS Pty Ltd · Storage - Battery

Operational AEMO: In Commissioning QLD1 Other - Other NEM data · 7 days
100/200 MW
Registered nameplate capacity / storage
7 days revenue
$73.4k
Capacity factor
-1.5%
Revenue / MWh
—
Est. SRMC
$1.75/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
100 MW / 200 MWh

AEMO status In Commissioning
Project status Operational (AI)

CS Energy website, 2024: Chinchilla Battery began operating in the National Electricity Market in July 2024.

Region QLD1
Coordinates —

MLF 0.9787
DUID CHBESS1
Owner CSE BESS Pty Ltd
Commissioned Jul 2024
Expected closure 2038
Closure date —
Technology Storage - Battery
Fuel Other - Other
Battery OEM Tesla
Battery platform / chemistry Megapack
Inverter OEM TGOOD
Inverter / PCS model 33kV switchroom / MV switchgear
Equipment confidence high
Stats window
18 Sep 2026 05:55 → 25 Sep 2026 05:55 AEST

Dispatch & revenue

18 Sep 2026 05:55 → 25 Sep 2026 05:55 AEST

Energy revenue (× MLF)
$73.4k
FCAS revenue (× MLF)
$539
FCAS volume
4,664.7 MWh
Dispatched
-244.8 MWh
Available
11,182.3 MWh
Curtailed
11,427.7 MWh
Curtailment
102.2%
of available
MLF used
0.9787
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

🔋 State of charge

Stored energy at the start of each 5‑minute interval (AEMO INITIAL_ENERGY_STORAGE). Available up to the latest next‑day dispatch file.

10.8 MWh 5%
at 25 Sep 03:45 · of 200 MWh registered

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional price — dispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of charge — INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-10-18 0.9761
2025-07-01 0.9875
2026-07-01 0.9787

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
100 MW / 200 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.75/MWh
Capex total (greenfield)
$175.23M

Shown in table
$175.23M (2026 real AUD)

Reported / source value
$150.00M (2022 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Official owner project page confirming total investment and scope.

Reference
Chinchilla Battery | CS Energy (high confidence)
Source recorded 06 Jun 2026

Capex refurbishment
—
Capex / MWh storage derived
$876,168

Shown in table
$876.2k (2026 real AUD)

Reported / source value
$750.0k (2022 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived from owner-reported total investment and storage capacity.

Reference
Chinchilla Battery | CS Energy (high confidence)
Source recorded 06 Jun 2026

Fixed OPEX (annual)
—

How this was derived
No owner-published fixed O&M value located.

Reference
Chinchilla Battery | CS Energy (low confidence)
Source recorded 06 Jun 2026

Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh
$1.75

Shown in table
$1.75 (2026 real AUD)

Reported / source value
$1.50 (2022 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M located; server-side default carried through.

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026

Notes
Plant-specific reported greenfield investment of $150 million including substation works. Operated commercially from July 2024. No reliable plant-specific fixed O&M, asset life, or battery efficiency figure was found in the searched sources; server-side fallback should only be used if allowed downstream.