Hydro · Hydro-Electric Corporation · Storage - Pumped hydro
13 Jun 2026 09:20 → 14 Jun 2026 09:20 AEST
| Capex total (greenfield) |
$2,663.93M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$177,596
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$45,000
Shown in table |
| Variable OPEX / MWh |
$1.31
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Hydro Tasmania's July 2025 fact sheet states the estimated cost of the Cethana Pumped Hydro Project is $2.6 billion (CY2023 real dollars). For this extraction, capex_total_aud is recorded as nominal/source-year reported value in 2025 as the latest project-specific published estimate located; the fact sheet also notes this is based on more detailed planning and design work and is higher than the original 2020 estimate. No verified plant-specific fixed O&M figure was found, so O&M remains unset except for the provided fallback variable O&M default.