BESS · Capital Battery Pty Ltd · Storage - Battery
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-09-12 | 1.0084 |
| 2025-07-01 | 1.0389 |
| Capex total (greenfield) |
$87.06M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$435,323
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
Project-specific greenfield capex was not found in the searched owner/developer and related sources. The owner/developer sources confirm a 100 MW / 200 MWh battery, construction start in December 2021, financial close in October 2022, and operations beginning in 2023 rather than a disclosed total project cost. Neoen states the asset will be maintained for at least 25 years. No verified plant-specific O&M, fuel, or heat-rate assumptions were found for a battery asset; emissions intensity is zero for operational generation emissions.