22 Jul 2026 01:15 → 23 Jul 2026 01:15 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield capex announcement for 'Calvale BESS' attributable to Lightsource bp was found in web search. Search results for Calvale/BESS pointed instead to Equis Australia's Calala BESS, which is a different project and owner, so it was not used. A relevant Lightsource bp Queensland battery project (Woolooga BESS) indicates Lightsource bp is active in Australian BESS development and gives a 20-year operating life assumption, but it is not the Calvale project and does not provide Calvale-specific capex. Given the absence of a verified Calvale-specific investment figure, capex fields are left null rather than inferred from benchmarks. Cost base year for fallback O&M benchmarking is set to 2024 (GenCost 2024 release year).